Address
7th floor, No.192 Zhengyang Middle Road, Qingdao City, Shandong Provice, China
Work Hours
Monday to Friday: 8AM - 6PM
Weekend: 10AM - 5PM
Address
7th floor, No.192 Zhengyang Middle Road, Qingdao City, Shandong Provice, China
Work Hours
Monday to Friday: 8AM - 6PM
Weekend: 10AM - 5PM
Euro Top Intermediate Frame is the same design as Layher speedy frame or Layher blitz frame.
– Made of steel, hot dip galvanized
– Made of aluminum, a lightweight option
Name | Material | Item No. | Size(M) |
---|---|---|---|
Euro Top Intermediate Frame | Steel | 1719.066 | 1.00m x 0.73m |
Euro Top Intermediate Frame | Steel | 1719.100 | 1.00m x 1.09m |
Name | Material | Item No. | Size(M) |
---|---|---|---|
Euro Top Intermediate Frame | Aluminium | 1769.073 | 1.00m x 0.73m |